Our work

Projects

From a 3 kW home system to a 1.65 MW industrial plant — solar delivered by the Axis group with JV partner NIR, and now by Axis Green Energy.

4.9 MWp+solar delivered by the Axis group & NIR
27+solar projects
2 banksofficial solar vendor: City Bank & BRAC Bank
3 kW – 1.65 MWfrom homes to industrial plants
Axis Green Energy

Our first project

DGDG400 kWp rooftop solarDG-PV controlGrid + diesel generators
In progress · 2026CapEx

Sajan Polymer Industries Ltd.

A 400 kWp rooftop solar system for a polymer manufacturer near Dhaka. The client owns the plant outright (CapEx), and DG-PV control lets it keep producing alongside both the grid and the factory's diesel generators. A structural survey set the size: the array goes only on the sheds that can safely carry it.

Capacity
400 kWp
Business model
CapEx (client-owned)
Solution
Rooftop · DG-PV hybrid
Storage
None
Group track record

Delivered by the Axis group & NIR

Our sister concerns Axis Energy Limited and Axis Safety Engineering Ltd., working with their joint-venture partner NIR, have delivered the solar projects below.

Bangladesh Investment Development Authority (BIDA) solar project photo 1 Bangladesh Investment Development Authority (BIDA) solar project photo 2 Bangladesh Investment Development Authority (BIDA) solar project photo 3 Bangladesh Investment Development Authority (BIDA) solar project photo 4
CompletedAxis–NIR JV

Bangladesh Investment Development Authority (BIDA)

Rooftop solar plant on the Biniyog Bhaban with a dedicated inverter room, lightning protection and ongoing maintenance.

Capacity
150 kWp
Type
Grid-tied rooftop solar
Location
Biniyog Bhaban, Agargaon, Dhaka
Delivered by
Axis group & NIR
Zakaria Knit Wear Ltd. solar project photo 1 Zakaria Knit Wear Ltd. solar project photo 2
CompletedAxis–NIR JV

Zakaria Knit Wear Ltd.

Rooftop array on the factory's metal-sheet sheds, supplying daytime production load.

Capacity
80 kWp
Type
Grid-tied rooftop solar
Location
Ghatail, Tangail
Delivered by
Axis group & NIR

Solar project references

ClientLocationSystemCapacity
Techno Green Carbon Ltd.PabnaGrid-tied1,650 kWp
Square Food and BeveragePabnaGrid-tied1,540 kWp
Univision Engineering Ltd.HabiganjGrid-tied465 kWp
Wendler Interlining Bangladesh Ltd.Trishal, MymensinghGrid-tied200 kWp
BIDA (Biniyog Bhaban)Agargaon, DhakaGrid-tied150 kWp
Johan Dream Valley ParkJhenaidahGrid-tied140 kWp
Zakaria Knit Wear Ltd.Ghatail, TangailGrid-tied80 kWp
City Bank PLC — branches (official solar vendor)NationwideGrid-tied80+ kWp
Natore PlasticNatoreGrid-tied75 kWp
Matro PowerCox's BazarGrid-tied62 kWp
Asim House Ltd.SirajganjOff-grid60 kWp
Active Energy Engineering Ltd.KhulnaGrid-tied58 kWp
Saymer TechSatkhiraGrid-tied50 kWp
Rohingya camp facilityCox's BazarOff-grid40 kWp
Gems BondDhakaGrid-tied40 kWp
Nuruzzaman Biswas Non-woven FactoryKushtiaGrid-tied36 kWp
Khan Auto Rice MillNatoreGrid-tied36 kWp
Azmat Fashions Ltd. (Axis Safety Engineering)Mirpur, DhakaGrid-tied36 kWp
BRIFKhansama, DinajpurGrid-tied26 kWp
Deke FashionMirpur, DhakaGrid-tied25 kWp
Ayesha Abed Foundation – AarongUkhiya, Cox's BazarGrid-tied25 kWp
Al Kashem HotelSatkhiraGrid-tied20 kWp
Hayat BuildersKhulnaHybrid20 kWp
City Bank PLC (Noakhali)NoakhaliGrid-tied15 kWp
Chowdhury Knit FabricsKashimpur, GazipurGrid-tied5 kWp
WelTech Solutions Ltd.ChattogramGrid-tied5 kWp
Mahabubur Rahman (residence)Ashulia, DhakaHybrid3 kWp

Also supplied: BRAC Bank (official solar vendor), Kazi Farms, TGCL, Losung Power Engineering, Labib Engineering, Energy Tech Engineering Solution, Electronics & Communication Solution.

Your project could be next

Send us 12 months of electricity bills for a free assessment, or visit our office in Uttara, Dhaka.